Phase 5C - Summary and Plans

- Phase 5C Options - various buildings from c.3,500 sqft to 40,000sqft
- Phase 5C comprises a sizeable plot on which it is possible to accommodate various layouts.
- Currently shown are 3 small/medium sized buildings which is the favoured option - however a single 3 story 40,000 sqft or 2 story 25,000 sqft office could also be designed on a bespoke basis to meet the exact needs of the larger space user.
- Status - Planning Application, yet to be submitted.
- Timescale - Planning Application, c. 3 to 4 months
- Construction - 12 to 18 months (subject to size and specification)
- Specification - to be determined in conjunction with a prospective occupier.
- BREEAM Excellent and an EPC ‘A’ rating to be targeted.
Favoured option shown;
| Phase 5C | Floor Area | Parking |
| 5Ci | 3,510 sq.ft. | 12 |
| 5Cii | 7,535 sq.ft. | 25 |
| 5Ciii | 4,545 sq.ft. | 15 |
| Total Phase 5C | 15,590sq.ft. | 52 |